Staples TRU RED Notepads 8.5" x 11.75" Project Planner Format Ruled White TR57379

★★★★★ 4.7 69 reviews

US$9.36
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by www.msa-sa.ch
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$9.36
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Sep 1
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by www.msa-sa.ch
Free 30-day returns Details

Product details

Management number 238154655 Release Date 2026/07/11 List Price US$9.36 Model Number 238154655
Category

Keep track of project planning details with this 6-pack of TRU RED 8.5 x 11.75-inch white heavyweight notepads.<br><br>Write easily on the rigid surface of these heavyweight notepad. The top-bound construction lets you turn to a fresh page during note-taking, while the perforated design supports easy sharing. Featuring a project planning template, this notepad lets you capture important details for later review. These TRU RED 8.5 x 11.75-inch white heavyweight notepads has a 20-pound paperweight for a sturdy feel and durability.<br><br>• Heavyweight perforated notepad with durable backer for writing with style.<br>• Sheet size: 8.5" x 11.75".<br>• 50 perforated sheets per pad.<br>• Six pads per pack.<br>• Top-bound design at the top allows you to easily remove pages or quickly flip through.<br>• Project planner format assists in note-taking with project planning in mind with topic section and numbered list.<br>• White paper.<br><br>• Sold as 6/Pack.

  • Sold as 6/Pack.
  • Heavyweight perforated notepad with durable backer for writing with style. Top-bound design at the top allows you to easily remove pages or quickly flip through.
  • Sheet size: 8.5" x 11.75". Project planner format assists in note-taking with project planning in mind with topic section and numbered list.
  • 50 perforated sheets per pad. White paper.
  • Six pads per pack.
Sheets 50
Paper rule type Unruled
Paper size 8.5 x 11 Inches (Letter)
Writing pad type Note Pad
Brand WorkLife Brands
Color White
Number of pads 6
Material Paper
Page color White
Height 1.49 in
Model name TRU RED Notepads 8.5" x 11.75" Project Planner Format Ruled White TR57379
Items included 6 notepads
Pack quantity 1
Retail packaging Multipack

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.7 out of 5
★★★★★
69 ratings | 28 reviews
How item rating is calculated
View all reviews
5 stars
86% (59)
4 stars
2% (1)
3 stars
1% (1)
2 stars
1% (1)
1 star
10% (7)
Sort by

There are currently no written reviews for this product.